|
|
 |
| US$ 25 738.73 |
| |
Installation of 11KV ring main unit
Installation of 1MVA transformer
Installation of standby generator
Installation of data network for LAN
Installation of fibre optic cabling
Installation of telephone system
Installation of addressable fire alarm system
Installation of LPG gas detection system
Installation of air conditioning control system |
|
|
|
| |
| US$64 880.12 |
| |
Installation of 11KV ring main unit
Installation of 500KVA transformer
Installation of standby generator
Installation of data network for LAN
Installation of fibre optic cable from
Administration block to commerce block
Installation of fibre optic cables local
Installation of telephone system
Installation of addressable fire alarm |
|
|
|
| |
| US$100 038.00 |
| |
Installation of 11KV ring main unit
Installation of 500KVA transformer
Installation of data network for LAN
Installation of fibre optic cable from
Administration block to workshop offices
Installation of telephone system
Installation of addressable fire alarm
|
|
|
| US$95 329.00 |
| |
Installation of 11KV ring main unit
Installation of 500KVA transformer
Installation of stage lighting
Installation of public address system
Installation of fire alarm system
|
|
|
| US$41 827.00 |
| |
Installation of flying bus bars
Installation of 5MVA transformer with OLTC
Installation of line isolators and circuit breaker
Installation of protection and control cubical
Installation of heater elements in existing 11KV panels
Installation of Solkor protection with ZESA
Installation of earth grid
Installation of security lighting |
|
|
|
US$5 600.00 |
| Installation of 34 low density houses Stage two |
|
|
| US$150 258.79 |
Installation of 200KVA generator
Installation of CCTV and Infer red Detection Installation of lighting and power
Installation of tower lighting |
|
|
| |
| US$14 423.96 |
| |
| US$64 750.00 |
| |
Installation to scanning tunnels
Installation to 3 story flats
Installation to security lighting |
|
|
|
| |
|
 |
|